Automated Data Quality Testing

DataOps Data Quality TestGen

Auto-generated data quality tests. Full coverage in minutes, not months. The core engine is free and open source. No six-figure platform fees. Your team's data quality should cost an engineer's salary for a month, not years.

  • 55data profiling column characteristics
  • 32data hygiene detectors
  • 34test types auto-generated from the profile
  • 19business rule and custom SQL test types

The periodic table of data quality

TestGen's checks, sorted by the data quality dimension each one protects.

Showing all 71 checks. Each tile links to its section in the TestGen documentation.

Key capabilities

Data contracts

A data contract nobody tests is just a document

A data contract is the receipt for the agreement between the team that ships data and the teams that use it. TestGen builds it from tables you've already profiled: an Open Data Contract Standard (ODCS) document and a test behind every quality rule. It keeps the contract in numbered versions, so the agreement never changes underneath the people who depend on it. Open source under Apache 2.0, so a supplier can run your contract before they ship.

  • ODCS import and export
  • Numbered versions
  • Schema Conformance
  • MCP

Generated, not hand-written

Start from a table group and TestGen fills in the document and the tests from profiling and the data catalog: types, keys, formats, observed ranges, required and unique columns, recency, row counts. Every declared table also gets a Schema Conformance test that reports drift.

Versions that hold still

Change the draft, preview it against your data, then freeze it as the next version. Only runs of the active version count toward results, scores, and alerts. Compare any two versions rule by rule or as side-by-side documents.

ODCS in, ODCS out, or through MCP

Someone emails you an ODCS file? Import it as a new contract. Export any version to send back. Your AI assistant can do the whole round trip through TestGen's MCP server: import, edit, freeze, compare, export.

Works where your data lives

  • Snowflake
  • Databricks
  • DuckDB
  • Azure Synapse
  • Azure SQL
  • SQL Server
  • BigQuery
  • Redshift
  • Oracle
  • SAP HANA
  • PostgreSQL

Also supported: Amazon Aurora PostgreSQL, Microsoft OneLake, and Salesforce Data 360. CSV, Parquet, and JSON files, read directly from a local path, Amazon S3, and Azure Blob Storage. Plus structured data in Apache Iceberg tables and file formats (Parquet, Avro, ORC, CSV, JSON) exposed as external tables, including Amazon Redshift Spectrum and Snowflake external tables.

Why teams choose TestGen

  • You Don't Have Time to Write Tests. TestGen Does It Automatically.

    You're buried in customer requests. You have no time to write tests, let alone innovate. TestGen scans your data and generates the tests and anomaly detectors for you. No coding, no massive YAML configuration.

Open Source with Reasonable Enterprise Pricing

Open source TestGen is free for one user, one project, and one database connection. Enterprise is a flat $100 per month per user and database connection, with unlimited tables and data volume. No per-table tax. A year of enterprise data quality costs roughly one data engineer's monthly salary.

Unlimited on every plan. Slide it all the way to ∞ and watch the price stay put.

Run every test as often as you like. Also unlimited, also $0.

  • 10 users × $100 $1,000
  • 3 connections × $100 $300
  • 1,000 tables $0
  • 1,000 tests run $0

$15,600 a year, or $1,300 a month

Talk to Sales

AI & Agents

Your AI assistant can now run your data quality program

TestGen ships a Model Context Protocol (MCP) server: 119 tools that span the whole data quality loop, from "what data do I have" to "email me when the score drops." Connect Claude, Claude Code, Cursor, Copilot, or Databricks Genie and ask in plain English. It's open source under Apache 2.0 and runs behind your firewall, so your warehouse credentials never leave your network.

  • Claude
  • Claude Code
  • Cursor
  • GitHub Copilot
  • Databricks Genie

Ask in plain English

Ask "what data do I have, and how healthy is it?" and get the inventory and a quality score in seconds. Ask "show me the rows behind that" and get the actual records that failed, not a chart about them.

Guided triage

Pre-built prompts turn a wall of overnight failures into a guided conversation. Failures grouped by test and column. What just broke, separated from what's been flaky for six weeks. TestGen records every disposition with an audit trail.

Autonomous, with a human veto

Put an agent on a schedule. It proposes fixes for the boring, repetitive failures like trailing whitespace, case, and ISO codes. Anything that needs judgment gets a ticket instead. Nothing touches your data until you approve it, and TestGen logs every action.

Same data, same security model, a different front door. The MCP server authenticates as you and runs every tool with your existing TestGen role. No per-seat agent tax in either edition.

TestGen versus the competition

Head-to-head comparisons with every major data quality and observability tool. Search for the one you are evaluating.

Frequently asked questions

What databases does TestGen support?

Snowflake, Databricks SQL, DuckDB, Azure Synapse Analytics, Azure SQL Database, Microsoft SQL Server, Microsoft OneLake, Google BigQuery, Amazon Redshift, Amazon Aurora PostgreSQL, Oracle Database 12c and later, SAP HANA, PostgreSQL, and Salesforce Data 360. All are supported in both open source and enterprise. TestGen also profiles and tests CSV, Parquet, and JSON files directly, on a local path, in Amazon S3, or in Azure Blob Storage, and works with file-based data (Parquet, Avro, ORC, CSV, JSON) through external table formats like Apache Iceberg, Redshift Spectrum, and Snowflake external tables.

Does TestGen work with file-based data?

Yes, two ways. TestGen profiles and tests CSV, Parquet, and JSON files directly, on a local path, in Amazon S3, or in Azure Blob Storage, with no database in front of them. It also tests Parquet, Avro, ORC, CSV, and JSON files that your data warehouse exposes as external tables (e.g., Apache Iceberg, Redshift Spectrum, Snowflake external tables).

Does TestGen support data contracts?

Yes, in open source and Enterprise since version 5.185.1 (November 12, 2026). A contract is a test suite that TestGen generates from tables you've profiled, or imports from an Open Data Contract Standard (ODCS) file. It keeps the tests in numbered versions you freeze and compare, and exports any version as ODCS. See the contracts documentation.

Can I write custom SQL tests?

Yes. TestGen supports two types of custom tests: custom conditions for row-level business rules (e.g., quantity_shipped <= quantity_ordered) and full custom SQL queries for complex joins and cross-table validation. These tests let you extend auto-generated coverage with domain-specific logic.

What's the difference between Open Source and Enterprise?

Open source includes the full testing engine: profiling, auto-generated tests, hygiene detection, anomaly monitoring, quality dashboards, and a built-in UI. It's limited to a single user, single project, and single database connection. Enterprise adds multi-user access with single sign-on (SSO) authentication support, role-based access control, multi-project management, PII masking, custom branding, and dedicated support.

How is pricing structured?

Enterprise pricing is a flat $100 per month per user and database connection, with unlimited tables and data volume. No per-table fees that scale unpredictably as your data grows.

How does TestGen compare to Great Expectations, Soda, or dbt tests?

Those tools require your team to write and maintain tests in Python, YAML, or SQL. TestGen auto-generates tests from your data. No code required. It covers about 80% of data quality testing automatically. You handle the 20% that needs domain judgment. See our vendor comparison page for head-to-heads against every major data quality tool.

Can TestGen work alongside my existing tools?

Yes. TestGen complements your existing data stack. It connects to your databases, runs tests in-place, and integrates results into your workflows. It works alongside orchestrators, BI tools, and data catalogs without replacing any of them.

Start generating tests in minutes

Install open source TestGen today, or request an Enterprise demo.

$ Select a platform above to get started.
The DataOps Way to Data Quality and Data Observability cover

Free book

Not ready to try it out now? Read the free book.

The DataOps Way to Data Quality and Data Observability covers why data quality keeps failing and what to do about it: culture, testing strategy, monitoring, and the seven deadly sins of AI-generated pipelines.

  • 620 pages
  • 63 chapters
  • Updated September 2026
  • By Chris Bergh, Chip Bloche, and Gil Benghiat